    • Martins Park - Boston
    • Lincoln Park - Somerville
    • BCM Garage - Boston
    • Kent's Island - Newbury
    • Winthrop Boat Ramp - Winthrop
    • Salem Power Plant - Salem
    • 275 Tremont Street - Boston
    • Industrial Marine Park - Boston
    • Methuen Boat Ramp - Methuen
    • Norfolk/Shirley Ave - Boston
    • MIT - Killian Court - Cambridge
    • Thomas Menino Park - Charlestown
    • 101 Station Drive - Westwood
    • Ashburnton Place – State House- Boston
    • Forbes Park – Chelsea
    • 86 Dummer Street– Brookline Housing Authority – Brookline
    • 9 Channel Center - Boston
    • Bellingham Power Plant – Bellingham
  • Contact Us
  • Welcome
  • About Us
  • Capabilities
  • Safety First
  • Company Leadership
    • James MacKay, President
    • Kyle Annutto, Lead Estimator/Project Manager
    • Rob Robinson, Senior Project Manager
    • Sindy Pires, Asst. Project Manager
    • Petra Turla, Estimating Coordinator
    • Joseph Rosato, Safety Officer
    • Lorrie Flaherty, Office Manager
  • Clients
  • Featured Projects
    • Martins Park - Boston
    • Lincoln Park - Somerville
    • BCM Garage - Boston
    • Kent's Island - Newbury
    • Winthrop Boat Ramp - Winthrop
    • Salem Power Plant - Salem
    • 275 Tremont Street - Boston
    • Industrial Marine Park - Boston
    • Methuen Boat Ramp - Methuen
    • Norfolk/Shirley Ave - Boston
    • MIT - Killian Court - Cambridge
    • Thomas Menino Park - Charlestown
    • 101 Station Drive - Westwood
    • Ashburnton Place – State House- Boston
    • Forbes Park – Chelsea
    • 86 Dummer Street– Brookline Housing Authority – Brookline
    • 9 Channel Center - Boston
    • Bellingham Power Plant – Bellingham
  • Contact Us
Martin's Park - Boston, MA

Job Description: Full Renovation of One Acre Site in the Seaport District General Contracted By MacKay. On the South Boston Waterfront at Children's Wharf (Fort Point), adjacent to the Boston Children’s Museum, MacKay Construction will build an universally accessible park to provide enjoyment for generations of Boston's children, families and visitors. The beautiful setting will include an accessible playground and passive open space honoring the youngest victim of the Boston Marathon bombings, Martin W. Richard. The park will be renamed Martin's Park

Lincoln Park Renovation - Somerville MA

Job Description: Full Renovation of Six Acre Site General Contracted By MacKay.  Project Consists of the Following: New Playground Structures at School with ADA Carousel, Adventure Playground, Both Playgrounds are Protected with Play Safety Surfacing, Splash Pad, New Soccer Field, New Softball Field, Skate Park, Parkour Park, Basketball Court, Outdoor Fitness Area with Outdoor Fitness Equipment, Asphalt Play Area that is Fully Painted with Graphics Including a Mural of The United States,  300+ LF Serpentine Retaining Wall with Form Liner, Outdoor Classroom with Jellybean Shaped Stage and Half Moon Seating Area Formed and Placed with Concrete and Finished With Custom Bent Radius Trex, New Deck Area Overlooking New Basketball Court, Installation of 25 Year Storm Retention System Capable of Holding 1,257,201 Gallons of Water from Park, Surrounding Neighborhoods and Union Square, Full Irrigation Package including Irrigation Water Holding Tank with Water Treatment System Service By Renovate Well, Musco Field Lighting System, Pathway Lighting, Community Gardening Areas, Fenced in Dog Park with Water Fountain for Dogs, All New Landscaping Package, Walking Paths Around Entire Park with Main Walk Way Accented with Color Concrete.

Boston Children's Museum Parking Garage - Boston

Job Description: Construct New Pile Supported Single Story Boston Children Museum Parking Garage at 28- 36 Sleeper Street, Boston Ma 02210. Structure to be completely constructed of concrete bearing on 14"x14" precast piles. New utilities for storm water, potable water, electrical and communications to be installed. Total site area is 8,023 sqft with building taking 4,740 sqft of the site. Classification is type 2 non combustible with occupancy classification of S-2. MacKay is general contracting this project and providing a turn key building package.

Boston College Brighton Fields - Boston, MA

Job Description: Concrete Package for the New Boston College Baseball and Softball facilities. The baseball field will include fixed seating for 1,000 spectators and the softball will hold 300 spectators. Bleachers, Dugouts, Pier and support building foundation included in this package along with flatwork and main plaza.

Salem Harbor Energy Station

Job Description: Construction of New Start-Of-The-Art 674 MW Natural Gas Plant. MacKay is Placing and Finishing Concrete Foundations and Slabs for Bond Brothers. Job Has a Total Of 40,000 Cubic Yards Of Reinforced Concrete To Make Up The Station's Foundation

Sidewalk Replacement and Eversource Electrical Vault Top Replacement - 275 Tremont Street - Boston

Job Description: Remove Existing Brick Sidewalk and Replace with New Concrete Sidewalk. Sidewalk To Be Replaced to ADA and Theater District Concrete Requirements.  Project Also Required Replacement of Existing Vault Cover With New Cover To Meet Current Guidelines.

Parcel – C1 - Industrial Marine Park - Boston 

Job Description: Demolish Elevated Slab In Place and Fill Site, Form and Place 440’ Batter Sea Wall, Install New BWSC Approved Drainage System, New Lighting and Security System and New Parking Lot with Guard Booth

Methuen Boat Ramp - Methuen

Job Description: Construction of New Boat Ramp with Cofferdam.  Installation of New Parking Lot With Lighting.  Due To the Rocky Bottom of the Merrimack River, MacKay Along With Dept. of Fish and Game - Fishing and Boating Access, Redesigned The Boat Ramp and Cofferdam Design.  Traditional Concrete Placement Was Used Within the Cofferdam, While Two Large Pieces of Pre-Cast Were Install Underwater With Divers. These Pieces Were Allowed Fishing and Boating Access To Maintain the Original Design Length Of the Ramp. 

Intersection - Shirley Ave and Norfolk Ave - Boston

Job Description: Contracted with Siemens Industry Inc.  To Completed the Civil and Concrete Portion Of Work For This Intersection Upgrade.  Installed New Handicap Sidewalk Ramps and Adjusted Curbing.  Paved All Trenches and Corrected Drainage Issues.

MIT-Killian Court - Cambridge

Job Description: Construction of New Walk Ways At Killian Court at MIT.  Layout, Forming, Placing and Finishing Exposed and Traditional Sidewalks Within Courtyard For Bond Brothers.  Worked Closely With Bond and MIT To Formulate Custom Exposed Aggregate Mix.

Parcel – 5 - Thomas Menino Park - Charlestown 

Job Description: Complete Site Demolition Package and Site Fill. Furnish and Install 10,000 sqft of rubber surface. Complete ADA Children’s Park in Front of Spaulding Rehabilitation Hospital.

101 Station Drive, Westwood- Interior Building and Exterior Renovation For Executive Offices

Job Description: Architectural Colored Feature Walls Integrated with New Building Curtain Wall System at Both Entrances, New Building Foundations.  Interior and Exterior Flatwork, Mud Slabs and Sidewalks

Ashburnton Place – State House- Boston 

Job Description: Install Flag Pole and Traffic Separation Median. Custom Radius Island with Granite Veneer.

Forbes Park – Chelsea 

Job Description: Cast in Place and Excavation – Sea Wall with 12,000 Cubic Yards of Concrete and 175 Tons Rebar – Fish Ladder and Water Fall – Bridge Abutments for MBTA and Set Bridges.

86 Dummer Street - Brookline - Brookline Housing Authority

Job Description: Gang Form Foundation, Architectural Concrete Finish, Site Retaining Walls and Site Concrete
                    


9 Channel Center - Boston

 Job Description: Interior Excavation and Concrete Package - Cut Entire Grade of First Floor Down Three Feet and Dispose of Dirt At Proper Facility.  Full Concrete Package including new elevator pit, interior transformer enclosure and new first floor structural slab placement.


Bellingham Power Plant – Bellingham

Job Description: Full Excavation and Concrete Package – Working at an Active Power Plant.

Picture
Picture
Picture
Picture
Picture
Picture
  • Welcome
  • About Us
  • Capabilities
  • Safety First
  • Company Leadership
    • James MacKay, President
    • Kyle Annutto, Lead Estimator/Project Manager
    • Rob Robinson, Senior Project Manager
    • Sindy Pires, Asst. Project Manager
    • Petra Turla, Estimating Coordinator
    • Joseph Rosato, Safety Officer
    • Lorrie Flaherty, Office Manager
  • Clients
  • Featured Projects
    • Martins Park - Boston
    • Lincoln Park - Somerville
    • BCM Garage - Boston
    • Kent's Island - Newbury
    • Winthrop Boat Ramp - Winthrop
    • Salem Power Plant - Salem
    • 275 Tremont Street - Boston
    • Industrial Marine Park - Boston
    • Methuen Boat Ramp - Methuen
    • Norfolk/Shirley Ave - Boston
    • MIT - Killian Court - Cambridge
    • Thomas Menino Park - Charlestown
    • 101 Station Drive - Westwood
    • Ashburnton Place – State House- Boston
    • Forbes Park – Chelsea
    • 86 Dummer Street– Brookline Housing Authority – Brookline
    • 9 Channel Center - Boston
    • Bellingham Power Plant – Bellingham