Martin's Park - Boston, MA
Job Description: Full Renovation of One Acre Site in the Seaport District General Contracted By MacKay. On the South Boston Waterfront at Children's Wharf (Fort Point), adjacent to the Boston Children’s Museum, MacKay Construction will build an universally accessible park to provide enjoyment for generations of Boston's children, families and visitors. The beautiful setting will include an accessible playground and passive open space honoring the youngest victim of the Boston Marathon bombings, Martin W. Richard. The park will be renamed Martin's Park
Job Description: Full Renovation of One Acre Site in the Seaport District General Contracted By MacKay. On the South Boston Waterfront at Children's Wharf (Fort Point), adjacent to the Boston Children’s Museum, MacKay Construction will build an universally accessible park to provide enjoyment for generations of Boston's children, families and visitors. The beautiful setting will include an accessible playground and passive open space honoring the youngest victim of the Boston Marathon bombings, Martin W. Richard. The park will be renamed Martin's Park
Lincoln Park Renovation - Somerville MA
Job Description: Full Renovation of Six Acre Site General Contracted By MacKay. Project Consists of the Following: New Playground Structures at School with ADA Carousel, Adventure Playground, Both Playgrounds are Protected with Play Safety Surfacing, Splash Pad, New Soccer Field, New Softball Field, Skate Park, Parkour Park, Basketball Court, Outdoor Fitness Area with Outdoor Fitness Equipment, Asphalt Play Area that is Fully Painted with Graphics Including a Mural of The United States, 300+ LF Serpentine Retaining Wall with Form Liner, Outdoor Classroom with Jellybean Shaped Stage and Half Moon Seating Area Formed and Placed with Concrete and Finished With Custom Bent Radius Trex, New Deck Area Overlooking New Basketball Court, Installation of 25 Year Storm Retention System Capable of Holding 1,257,201 Gallons of Water from Park, Surrounding Neighborhoods and Union Square, Full Irrigation Package including Irrigation Water Holding Tank with Water Treatment System Service By Renovate Well, Musco Field Lighting System, Pathway Lighting, Community Gardening Areas, Fenced in Dog Park with Water Fountain for Dogs, All New Landscaping Package, Walking Paths Around Entire Park with Main Walk Way Accented with Color Concrete.
Job Description: Full Renovation of Six Acre Site General Contracted By MacKay. Project Consists of the Following: New Playground Structures at School with ADA Carousel, Adventure Playground, Both Playgrounds are Protected with Play Safety Surfacing, Splash Pad, New Soccer Field, New Softball Field, Skate Park, Parkour Park, Basketball Court, Outdoor Fitness Area with Outdoor Fitness Equipment, Asphalt Play Area that is Fully Painted with Graphics Including a Mural of The United States, 300+ LF Serpentine Retaining Wall with Form Liner, Outdoor Classroom with Jellybean Shaped Stage and Half Moon Seating Area Formed and Placed with Concrete and Finished With Custom Bent Radius Trex, New Deck Area Overlooking New Basketball Court, Installation of 25 Year Storm Retention System Capable of Holding 1,257,201 Gallons of Water from Park, Surrounding Neighborhoods and Union Square, Full Irrigation Package including Irrigation Water Holding Tank with Water Treatment System Service By Renovate Well, Musco Field Lighting System, Pathway Lighting, Community Gardening Areas, Fenced in Dog Park with Water Fountain for Dogs, All New Landscaping Package, Walking Paths Around Entire Park with Main Walk Way Accented with Color Concrete.
Boston Children's Museum Parking Garage - Boston
Job Description: Construct New Pile Supported Single Story Boston Children Museum Parking Garage at 28- 36 Sleeper Street, Boston Ma 02210. Structure to be completely constructed of concrete bearing on 14"x14" precast piles. New utilities for storm water, potable water, electrical and communications to be installed. Total site area is 8,023 sqft with building taking 4,740 sqft of the site. Classification is type 2 non combustible with occupancy classification of S-2. MacKay is general contracting this project and providing a turn key building package.
Job Description: Construct New Pile Supported Single Story Boston Children Museum Parking Garage at 28- 36 Sleeper Street, Boston Ma 02210. Structure to be completely constructed of concrete bearing on 14"x14" precast piles. New utilities for storm water, potable water, electrical and communications to be installed. Total site area is 8,023 sqft with building taking 4,740 sqft of the site. Classification is type 2 non combustible with occupancy classification of S-2. MacKay is general contracting this project and providing a turn key building package.
Boston College Brighton Fields - Boston, MA
Job Description: Concrete Package for the New Boston College Baseball and Softball facilities. The baseball field will include fixed seating for 1,000 spectators and the softball will hold 300 spectators. Bleachers, Dugouts, Pier and support building foundation included in this package along with flatwork and main plaza.
Job Description: Concrete Package for the New Boston College Baseball and Softball facilities. The baseball field will include fixed seating for 1,000 spectators and the softball will hold 300 spectators. Bleachers, Dugouts, Pier and support building foundation included in this package along with flatwork and main plaza.
Salem Harbor Energy Station
Job Description: Construction of New Start-Of-The-Art 674 MW Natural Gas Plant. MacKay is Placing and Finishing Concrete Foundations and Slabs for Bond Brothers. Job Has a Total Of 40,000 Cubic Yards Of Reinforced Concrete To Make Up The Station's Foundation
Job Description: Construction of New Start-Of-The-Art 674 MW Natural Gas Plant. MacKay is Placing and Finishing Concrete Foundations and Slabs for Bond Brothers. Job Has a Total Of 40,000 Cubic Yards Of Reinforced Concrete To Make Up The Station's Foundation
Sidewalk Replacement and Eversource Electrical Vault Top Replacement - 275 Tremont Street - Boston
Job Description: Remove Existing Brick Sidewalk and Replace with New Concrete Sidewalk. Sidewalk To Be Replaced to ADA and Theater District Concrete Requirements. Project Also Required Replacement of Existing Vault Cover With New Cover To Meet Current Guidelines.
Job Description: Remove Existing Brick Sidewalk and Replace with New Concrete Sidewalk. Sidewalk To Be Replaced to ADA and Theater District Concrete Requirements. Project Also Required Replacement of Existing Vault Cover With New Cover To Meet Current Guidelines.
Parcel – C1 - Industrial Marine Park - Boston
Job Description: Demolish Elevated Slab In Place and Fill Site, Form and Place 440’ Batter Sea Wall, Install New BWSC Approved Drainage System, New Lighting and Security System and New Parking Lot with Guard Booth
Job Description: Demolish Elevated Slab In Place and Fill Site, Form and Place 440’ Batter Sea Wall, Install New BWSC Approved Drainage System, New Lighting and Security System and New Parking Lot with Guard Booth
Methuen Boat Ramp - Methuen
Job Description: Construction of New Boat Ramp with Cofferdam. Installation of New Parking Lot With Lighting. Due To the Rocky Bottom of the Merrimack River, MacKay Along With Dept. of Fish and Game - Fishing and Boating Access, Redesigned The Boat Ramp and Cofferdam Design. Traditional Concrete Placement Was Used Within the Cofferdam, While Two Large Pieces of Pre-Cast Were Install Underwater With Divers. These Pieces Were Allowed Fishing and Boating Access To Maintain the Original Design Length Of the Ramp.
Job Description: Construction of New Boat Ramp with Cofferdam. Installation of New Parking Lot With Lighting. Due To the Rocky Bottom of the Merrimack River, MacKay Along With Dept. of Fish and Game - Fishing and Boating Access, Redesigned The Boat Ramp and Cofferdam Design. Traditional Concrete Placement Was Used Within the Cofferdam, While Two Large Pieces of Pre-Cast Were Install Underwater With Divers. These Pieces Were Allowed Fishing and Boating Access To Maintain the Original Design Length Of the Ramp.
Intersection - Shirley Ave and Norfolk Ave - Boston
Job Description: Contracted with Siemens Industry Inc. To Completed the Civil and Concrete Portion Of Work For This Intersection Upgrade. Installed New Handicap Sidewalk Ramps and Adjusted Curbing. Paved All Trenches and Corrected Drainage Issues.
Job Description: Contracted with Siemens Industry Inc. To Completed the Civil and Concrete Portion Of Work For This Intersection Upgrade. Installed New Handicap Sidewalk Ramps and Adjusted Curbing. Paved All Trenches and Corrected Drainage Issues.
MIT-Killian Court - Cambridge
Job Description: Construction of New Walk Ways At Killian Court at MIT. Layout, Forming, Placing and Finishing Exposed and Traditional Sidewalks Within Courtyard For Bond Brothers. Worked Closely With Bond and MIT To Formulate Custom Exposed Aggregate Mix.
Job Description: Construction of New Walk Ways At Killian Court at MIT. Layout, Forming, Placing and Finishing Exposed and Traditional Sidewalks Within Courtyard For Bond Brothers. Worked Closely With Bond and MIT To Formulate Custom Exposed Aggregate Mix.
Parcel – 5 - Thomas Menino Park - Charlestown
Job Description: Complete Site Demolition Package and Site Fill. Furnish and Install 10,000 sqft of rubber surface. Complete ADA Children’s Park in Front of Spaulding Rehabilitation Hospital.
Job Description: Complete Site Demolition Package and Site Fill. Furnish and Install 10,000 sqft of rubber surface. Complete ADA Children’s Park in Front of Spaulding Rehabilitation Hospital.
101 Station Drive, Westwood- Interior Building and Exterior Renovation For Executive Offices
Job Description: Architectural Colored Feature Walls Integrated with New Building Curtain Wall System at Both Entrances, New Building Foundations. Interior and Exterior Flatwork, Mud Slabs and Sidewalks
Job Description: Architectural Colored Feature Walls Integrated with New Building Curtain Wall System at Both Entrances, New Building Foundations. Interior and Exterior Flatwork, Mud Slabs and Sidewalks
Ashburnton Place – State House- Boston
Job Description: Install Flag Pole and Traffic Separation Median. Custom Radius Island with Granite Veneer.
Job Description: Install Flag Pole and Traffic Separation Median. Custom Radius Island with Granite Veneer.
Forbes Park – Chelsea
Job Description: Cast in Place and Excavation – Sea Wall with 12,000 Cubic Yards of Concrete and 175 Tons Rebar – Fish Ladder and Water Fall – Bridge Abutments for MBTA and Set Bridges.
Job Description: Cast in Place and Excavation – Sea Wall with 12,000 Cubic Yards of Concrete and 175 Tons Rebar – Fish Ladder and Water Fall – Bridge Abutments for MBTA and Set Bridges.
86 Dummer Street - Brookline - Brookline Housing Authority
Job Description: Gang Form Foundation, Architectural Concrete Finish, Site Retaining Walls and Site Concrete
Job Description: Gang Form Foundation, Architectural Concrete Finish, Site Retaining Walls and Site Concrete
9 Channel Center - Boston
Job Description: Interior Excavation and Concrete Package - Cut Entire Grade of First Floor Down Three Feet and Dispose of Dirt At Proper Facility. Full Concrete Package including new elevator pit, interior transformer enclosure and new first floor structural slab placement.
Job Description: Interior Excavation and Concrete Package - Cut Entire Grade of First Floor Down Three Feet and Dispose of Dirt At Proper Facility. Full Concrete Package including new elevator pit, interior transformer enclosure and new first floor structural slab placement.
Bellingham Power Plant – Bellingham
Job Description: Full Excavation and Concrete Package – Working at an Active Power Plant.
Job Description: Full Excavation and Concrete Package – Working at an Active Power Plant.